
Excavators (YL128W) |
Basic parameters |
Weight |
11500KG |
Rated speed |
2200r/min |
Rated power |
73.5kw/86kw |
Dimensions |
Total length |
70580mm |
Total width |
2480mm |
Total height |
3300mm |
Tread |
1955mm |
Wheelbase |
2600mm |
Counterweight clearance |
1180mm |
Minmum ground clearance |
350mm |
Scope of work |
Maximun working radius |
7280mm |
Maximun unloading height |
5660mm |
Maximun excavation height |
7790mm |
Maximun excavation depth |
4400mm |
Tail turning radius |
2100mm |
Bucket capacity |
0.45m3 |
Boom length |
4120mm |
Stick length |
2050mm |
Performance parameter |
Walking speed(high/low) |
30km/h |
Platform rotation speed |
9.3r/min |
Quality of work |
11500KG |
Tire size |
825-20 |
Climbing ability |
52%(27.50) |
Maximun digging force(bucket) |
68KN |
Maximun digging force(stick) |
52KN |
Hydraulic system |
Working pressure |
32MPa |
Flow |
105L/min |
Capacity of hydraulic oil tank |
210L |
Fuel tank capacity |
236L |
Note: Prices vary based on configuration. |
Company Profile

Certifications



Packaging & Shipping
FAQ
Q1: What trade terms do you offer?
A1: Flexible international trade options:
EXW (Ex Works) - Factory pickup
FOB Haikou/Xiamen Port
CIF (Cost, Insurance & Freight) to designated ports
Q2: What's included in your warranty coverage?
A2: 24-month comprehensive warranty on core components, backed by our ISO 9001-certified quality management system.
Q3: How many color customization options are available?
A3: Choose from 30+ standard colors with Pantone matching, or request custom colors (MOQ applies).
Q4: What are your production timelines?
A4: Standard lead times:
15-20 working days post-deposit (regular season)
25-30 working days (August-October peak season)
*Expedited production available for urgent orders
Q5: What payment methods do you accept?
A5: Secure transactions through:
30% deposit via T/T or L/C at sight to initiate production
70% balance payment before shipment
*Government project financing solutions available
Q6: How are products packaged for shipping?
A6: Professional knock-down (KD) packaging system:
Reinforced steel frame construction
Shock-absorbent EPE pearl cotton lining
IP67-grade waterproof wrapping
Q7: Do you provide assembly support?
A7: Every shipment includes:
Step-by-step illustrated manuals (multilingual)
QR-code linked video tutorials
Dedicated technical support hotline
Q8: What export documentation is provided?
A8: Full compliance package:
Commercial Invoice
Packing List
Bill of Lading/Airway Bill
Certificate of Origin
CE/ROHS certifications (industry-specific)
Q9: What if products are damaged during transit?
A9: Our triple protection guarantee:
Mandatory cargo insurance for all shipments
72-hour damage claim response protocol
Replacement parts dispatched within 5 working days
Q10: How are missing parts handled?
A10: Rapid resolution process:
Component identification within 24 hours
Express shipping via DHL/UPS (3-7 days)
$200 credit compensation per incident