





Excavators (YL100W) |
Basic parameters |
Work quality(rubber shoes/iron shoes) |
9600kg |
Rated power/rated speed(net) |
62.5kw/(R/min)/2200r/min |
Dimensions |
Total length |
7080mm |
Total width |
2380mm |
Total height |
2950mm |
Tread |
1700mm |
Wheelbase |
2500mm |
Minmum ground clearance |
340mm |
Scope of work |
Maximun working radius |
7610mm |
Maximun unloading height |
5325mm |
Maximun excavation height |
7990mm |
Maximun excavation depth |
4185mm |
Bucket capacity |
0.35m3 |
Boom length |
4000mm |
Stick length |
2100mm |
Performance parameter |
Walking speed(high/low) |
33km/h |
Platform rotation speed |
10.5r/min |
Grip opening |
1200mm |
Bulldoing up/down |
465/85mm |
Maximun digging force(bucket) |
48KN |
Maximun digging force(stick) |
35KN |
Maximum gripping weight |
≤1200 |
Hydraulic system |
Working pressure |
21MPa |
Flow |
187L/min |
Capacity of hydraulic oil tank |
160L |
Fuel tank capacity |
160L |
Note: Prices vary based on configuration. |
Company Profile

Certifications



Packaging & Shipping
FAQ
Q1: What trade terms do you offer?
A1: Flexible international trade options:
EXW (Ex Works) - Factory pickup
FOB Haikou/Xiamen Port
CIF (Cost, Insurance & Freight) to designated ports
Q2: What's included in your warranty coverage?
A2: 24-month comprehensive warranty on core components, backed by our ISO 9001-certified quality management system.
Q3: How many color customization options are available?
A3: Choose from 30+ standard colors with Pantone matching, or request custom colors (MOQ applies).
Q4: What are your production timelines?
A4: Standard lead times:
15-20 working days post-deposit (regular season)
25-30 working days (August-October peak season)
*Expedited production available for urgent orders
Q5: What payment methods do you accept?
A5: Secure transactions through:
30% deposit via T/T or L/C at sight to initiate production
70% balance payment before shipment
*Government project financing solutions available
Q6: How are products packaged for shipping?
A6: Professional knock-down (KD) packaging system:
Reinforced steel frame construction
Shock-absorbent EPE pearl cotton lining
IP67-grade waterproof wrapping
Q7: Do you provide assembly support?
A7: Every shipment includes:
Step-by-step illustrated manuals (multilingual)
QR-code linked video tutorials
Dedicated technical support hotline
Q8: What export documentation is provided?
A8: Full compliance package:
Commercial Invoice
Packing List
Bill of Lading/Airway Bill
Certificate of Origin
CE/ROHS certifications (industry-specific)
Q9: What if products are damaged during transit?
A9: Our triple protection guarantee:
Mandatory cargo insurance for all shipments
72-hour damage claim response protocol
Replacement parts dispatched within 5 working days
Q10: How are missing parts handled?
A10: Rapid resolution process:
Component identification within 24 hours
Express shipping via DHL/UPS (3-7 days)
$200 credit compensation per incident